Compare what the beneficiary could receive for the same total spend using the daily reference rate. Estimates use a published business tariff or illustrative pricing. Actual terms depend on volume and payment route.
How we calculate this
The daily reference rate is applied to each route after its fixed fee and FX spread. The £100,000 example uses a sample GBP/EUR reference of 1.1600 and a modelled bank payout as the original payment.
The GBP traditional bank model uses the published standard business FX margin bands and assumes the £15 online international payment charge. Between published band endpoints, the margin is estimated by interpolation. Other currencies and amounts outside the published bands require pricing inputs.
Published business FX tariff · Payment charges
The non-UK bank scenario models 3%, 2%, 1.75% or 1.5% at USD-equivalent thresholds of $50,000, $250,000 and $1 million. It adds 0.5 percentage points for other currency pairs and assumes no separate wire fee unless you enter one. These are modelling assumptions.
For GBP or EUR payouts into Nigerian naira, the partnered EMI scenario assumes an indicative 0.75% spread at qualifying volumes. Enter any separately quoted fees. NGN collections require a specialist quote covering collection, conversion and settlement.
FX specialist and EMI assumptions distinguish major currency pairs from other pairs and can model higher-risk sector pricing. Actual eligibility and fees depend on the provider, corridor and volume.
Institutional pricing is based on indicative terms for qualifying large tranches. A 0.50% institutional OTC quote covered a single conversion between fiat and USDT, or from BTC to USDT or fiat. The optional 0.50%–0.75% fiat-to-fiat range is based on separately quoted all-in institutional terms. Two separately charged 0.50% conversions cost approximately 1.00% before any separate payout fees. Actual terms depend on the transaction size, route and provider approval.
The stablecoin scenario includes estimated funding, conversion and payout costs. The studies below provide context on cost variability and do not establish a corporate quote for this amount or corridor.